Supply Chain Process Overview
Canton ensure that its customers get the required product at affordable using consistent communica- tion.

  • Compleation of orders through proactive perception and spot-on real-time responses
  • Procurement and inventory management in order to minimize poduct costs
  • Logistics and transportation facilities across multiple modes of transport
  • Information technology is used in order to monitor and control inventory

Starting Requirements and Specifications
The following is a list of the desired components needed to start a job.
1. Gerber Data for All Artwork Layers.
2. Aperture* List or Lists for all layers.
3. Drill file in Gerber or Excellon format.
4. Prints that show:
    ( Print should be a hard copy, or in Gerber or HPGL format.)
    • Fab dimensions with tolerances.
    • Datum.
    • Hole coding.
    • Overall thickness.
Hole size reference with the following info. For
each symbol
    •Finished Hole Size
    •Tolerance
    •Plated vs. Non plated
    •Hole quantity
5. Special Notes or "Read Me" file that pertains to:
    • color and type of soldermask.
    • color of Silkscreen.
    • Plating thickness for Copper, Nickel and Gold
      (If applicable ).
    • Notes for Cross sectioning or Serialization.
    • Controlled Impedance Requirements and                 tolerances if any.
    • Any other special requirements or instructions.
6. Standards and Specifications:
  • •IPC-A-600 Acceptability of printed wiring boards
  • •IPC-RB-276 Qualification and performance specs
  • •( Class 2 )
  • •IPC-D-275 Design standards for rigid printed boards
  • •IPC-TM-650 Test methods manual
  • •IPC-SM-840 Qualification and performance of    permanent polymer coatings









  Copyrights © 2008-2009 Canton Treasure Corporation Limited